sorodni izrazi in sinonimi v sodobni slovenščini, hrvaščini in srbščini
Podobnost besed in fraz med rezultati je odvisna od tega, kolikokrat se beseda ali fraza pojavi v podobnem stavčnem kontekstu kot "embankment".
Primeri iz korpusa
Korpus Common Crawl
Common Crawl je korpus spletnih strani
Za “ trnovski embankment ” imamo lep domač izraz – trnovsko nabrežje , ali še lepše trnovski pristan , da o naslovu sploh ne izgubljam besed ….
It consists of an embankment with a ditch on the east side.
Nasip (Embankment) je del cestnega telesa med posteljico in temeljnimi tlemi, zgrajen iz zemljin in/ali kamnin.
Figure 6: Internal erosion from the embankment body into the foundation and erosion on contact with the impervious material.
Figure 5.25: Undrained shear strength of the red gypsum mud from the accumulation (blue symbols) and under the dry embankment (green symbols).
Figure 14: Instability in the upstream and downstream face of the embankment due to rapid variation in the reservoir levels.
Mesto ponuja številne muzeje , poznan je » Embankment « , ki je stičišče več muzejev .
Figure 5.35: Hydraulic conductivity of red gypsum mud from accumulation and under the dry embankment.
Figure 40: BIM model during the construction of the protective embankment of the gallery.
Po njegovi smrti je Margaret vsak dan obiskala najbližjo podzemno postajo Embankment samo zato, da bi slišala glas svojega pokojnega moža.
Figure 56: Downstream bank of the retention embankment with visible leachate traces.
Figure 8.10: Comparison of compression curves of red gypsum mud under dry embankment.
Figure 11: Failure of composite embankment dam with a clay core.
Figure 20: Hydrogeological map with gypsum basin area and retention embankment [12].
Tale , parnik iz leta 1934 , je zasidran v predelu Embankment in služi Londončanom kot pub , restavracija , diskač in podobno .
Figure 7: Landfill retention embankment with traces of leachate.
Figure 4: Internal erosion through the embankment dam body.
Figure 8.7: Parameter Ce, versus effective vertical stress for red gypsum mud under the dry embankment.
Settlement measurement results of the embankment between the profiles P100 and P114, where the biggest settlements were registered.
Figure 38: Cross section of the planned protective embankment.